The Storm Sewer Division is responsible for the maintenance and repair of all Village owned storm sewer infrastructure and storm drainage ways. The Village currently maintains (224) miles of storm sewer pipe ranging between (4) and (72) inches in diameter, over (60) miles of creek lines, (4,100) catch‐basins, (1,100) outlets, and (6,500) street inlets. Monthly inspections are performed on all Village drainage ways and lake/pond outfall pipes to reduce the risk of flooding during heavy rain events.

 Flooding? Sewer Blockage?
If you are experiencing flooding or a sewer blockage call the
Public Works Department at (847) 490-6800. 
If the event occurs before or after hours, please contact the Police Department (847) 882-1818.

(Public Works is open - Monday – Friday from 8:00 am - 4:00 pm)

 

Selected 2023 Accomplishments

  • Completed creek line cleaning in the Parcel A (south), Parcel B (south), Victoria Park (south), Pine Park (north), Hunters Ridge (west), Shoe Factory access road (west).   
  • Rebuilt and repaired storm catch basins/inlets (32).
  • Flushed and cleaned over (10,500) feet of storm pipe.   